Terminal 2 and Pier E Dublin Airport
Main Contractor
PJ Hegarty & Sons Ltd.Project Background
The new Terminal 2 and Pier E buildings at Dublin Airport is capable of handling up to 15 million passengers per year and has 19 air bridges. The project is estimated to have cost in the region of €600 million.
The terminal is designed to meet the needs of both long-haul and short-haul passengers and airlines. This 75,000 square metre three storey curvilinear building designed specifically with travellers’ needs in mind makes use of natural light, creates a bright airy space for passengers that is calm and relaxing. A new departures building, Pier E was also completed perpendicular to the new terminal.
Application
Products were used for service penetrations to achieve acoustic and fire ratings on walls.